The assesment approach was two-fold, including functional testing of the system (i.e. did the control technology work as intended) and quantification of load shedding resulting from use of the controls. The control strategies were also evaulated for ease of installation, reliability, and customer acceptance. Additional technology performance criteria, including system costs, are presented in the report.
PGE 0813 - Industrial/Manufacturing Plant
PGE 0814 - Commerical Office
For more information, please contact the sponsoring organization.