COST ANALYSIS AND REDUCTION OF POWER QUALITY MITIGATION HARDWARE
Report Fields
| Project Number | 34 |
| Start Year | 2005 |
| Markets Segments | Industrial / Manufacturing |
| Project Type | Hardware |
| Type of Technology | Other |
| Organization | California Energy Commission - PIER program |
| Project Status | Completed • Basic Research • Applied Research |
The purpose of this project is to develop several case studies demonstrating how a system cost analysis and a probabilistic framework methodology can be applied to real-life customer applications to evaluate the system benefits of power quality mitigation hardware.
|