Investigate and demonstrate methods to reduce the cost of building commissioning and diagnosis. The research will focus on how building data is collected, verified and analyzed.
PM: Joseph Wang
Improve C/E of Building CommissioningReport Fields
Investigate and demonstrate methods to reduce the cost of building commissioning and diagnosis. The research will focus on how building data is collected, verified and analyzed.
PM: Joseph Wang |