Markets » Other
Awaiting summary.
Markets » Other
Awaiting summary.
Download project report.
Markets » Other
Project Summary:About 2,500-4,000 new relocatable classrooms are delivered to California schools each year. Construction specifications for high-performance classrooms have been developed through computer simulation. However, no relocatable classroom units have yet been...
Markets » Other
Awaiting summary.
Markets » Other
Plastic resin has to be dried to set moisture level prior to feeding into injection molding, blow molding, or other extrusion machines. The conventional drying technology is to use a...
Markets » Other
Southern California Edison evaluated the potential energy savings of replacing obsolete 500W incandescent lamps with third-generation, programmable start, ballasted T8s, also known as Super T8s. The new lighting system is...
Markets » Other
The Building Energy Efficiency Standards (Title 24) are based upon the cost-effectiveness of efficiency measures that can be incorporated into new buildings in California. Historically, the method to assign value...
Markets » Other
This report describes data sources, results, and provides links to spreadsheets containing the input data and calculations used in the 2008 Time Dependent Valuation (TDV) update to include demand response....
Markets » Other
This energy efficiency study determined the demand reduction and energy savings of 12 vertical sash, variable air volume fume hoods. The assessment compared the volumetric air flow rates of fume...