Sector
Residential
End-use
Water Heating/DHW/HPWH
Project Number
PGE 0613
Project Summary:A laboratory dedicated to water heating was designed and built at the PG&E San Ramon Technology Center. The overall goal of the water heater lab is to identify energy efficiency opportunities and verify the energy savings potential as related to both residential and commercial...
Sector
Public
End-use
Lighting
Project Number
PGE 0727
Project SummaryThis report summarizes an assessment project conducted to study the performance of light emitting diode (LED) luminaires in a street lighting application. The project included installation of four manufacturers’ LED street lights on public roadways in San Francisco, California....
Sector
Commercial
End-use
Lighting
Project Number
PGE 0717
Project SummaryThis report summarizes the installation and assessment of light emitting diode (LED) luminaires at a major hospitality chain location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as well as customer...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0718
Project SummaryThis report summarizes the installation and assessment of light emitting diode (LED) luminaires at a major hospitality chain location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as well as customer...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0723
Project SummaryThis report summarizes the installation and assessment of linear lighting systems of Light Emitting Diodes (LEDs) at a regional supermarket chain location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0728
Project SummaryThis report summarizes the installation and assessment of linear lighting systems of Light Emitting Diodes (LEDs) at an international retail chain location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0721
Project SummaryThis report summarizes the installation and assessment of electronic HID at a regional supermarket chain location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as well as customer satisfaction surveys and...
Sector
Residential
End-use
HVAC
Project Number
PGE 0710
Project SummaryThis project analyzes and tests the integration of night ventilation cooling technology into a standard heating, ventilation, and air conditioning (HVAC) system. Night ventilation systems automatically ventilate houses using the normal air handler, supply, and return duct system, as...
Sector
Commercial, Agricultural
End-use
Other
Project Number
ET 07.07
Project SummaryA “control interlock” to stop air entering a dairy milking vacuum system. When milking cows, a pulsation unit lets atmospheric air into chambers at the milking claw which makes a gripping motion and then milk flows from the cow. When milk stops flowing, existing controls detach the...
Sector
Commercial
End-use
Other
Project Number
ET 08.01
Project SummaryOffice of the Future looks across a spectrum of technologies and energy factors including thermal comfort, lighting systems, building envelope, plug loads and overlays economic and human factors analysis on traditional engineering and product improvement efforts. The resulting models...