Skip to main content
Sector Commercial
End-use HVAC
2019 - 2023
SCE
ACTIVE Follow
The objective of this project is to evaluate the performance in the laboratory of a new-to-market 120-gallon commercial Heat Pump Water Heater and its ability to provide hot water in a more efficient manner and with lower total emissions. This water heater has a COP of...
Sector Residential
End-use Water Heating
2019 - 2024
SCE
ACTIVE Follow
As part of SJV Pilot, SCE included a study to deploy HPWHs equipped with communication technology that will allow the water heater to be used as a grid-responsive heating technology element of the pilot to electrify homes and reduce emissions within the SJV. SCE hopes to gain insight into how...
Sector Residential
End-use Water Heating
2019 - 2023
SCE
ACTIVE Follow
Design and pilot of a central CO2 heat pump water heating (HPWH) system and measurement & verification (M&V) work at the proposed 117-unit, 157,000 SF Culver City Senior Housing development. The project includes primarily independent living apartments with efficiency kitchens and a large central...
Sector Industrial
End-use Process Loads
2019 - 2024
SCE
ACTIVE Follow
Replace low pressure, saturated natural gas fired steam boilers, with two stage heat pump system. Provide first stage heat pump for high temperature hot water needs for sterilization and, and then use second stage for steam needs of the bakery. Use of advanced heat pumps with low GWP refrigerants...
Sector Commercial
End-use Process Loads
2019 - 2021
SCE
PDF Available
COMPLETE Follow
This project will help determine the effectiveness of Phase Change Materials (PCMs) in cold storage applications at Low Temperature -10 - 0 F (-23 - 18 C). Controls will also be implemented into the study to determine how compatible it is with PCMs. A total of 4 tests will be done on warehouses to...