Project Info

Active
Project Title 
Advanced High Temperature, Low Pressure Steam Heat Pump
Project Number 
ET19SCE1160
Investor Owned Utilities 
SCE
End-use 
Process Loads
Sector 
Industrial
Project Year(s) 
2019 - 2024
Description 

Replace low pressure, saturated natural gas fired steam boilers, with two stage heat pump system. Provide first stage heat pump for high temperature hot water needs for sterilization and, and then use second stage for steam needs of the bakery. Use of advanced heat pumps with low GWP refrigerants will provide very efficient methods for providing process heat.