Skip to main content
Project Info ACTIVE Project Title

Central HPWH Retrofit Readiness Through Hot Water Distribution System Optimization Focused Pilot

Project Number ET25SWE0062 Organization SWE (Statewide Electric ETP) End-use Water Heating/DHW/HPWH Sector Commercial Project Year(s) 2025 - 2026
Project Results
Central hot water distribution systems in commercial buildings can have inefficiencies that are masked by oversized gas-fired water heaters. When commercial buildings consider retrofitting to central heat pump water heater systems in place of gas-fired systems, these inefficiencies can become more apparent and impact the performance and level of service of the central heat pump water heater. The Focused Pilot aimed to address distribution system inefficiencies in commercial domestic hot water distribution systems by developing a diagnostic tool and optimization guide for contractors to use in the field. The Focused Pilot conducted site visits and interviewed contractors and design engineers to determine the common system inefficiencies they see in commercial buildings. The Project Team also reviewed existing California electronic Technical Reference Manual measures and Title 24, Part 6 code requirements related to distribution system efficiency to understand existing optimization measures available. The Project Team sent the draft diagnostic tool and optimization guide to several contractors and design engineers to gather feedback from the market on the tool and to understand pathways to disseminate the tool to contractors within California.The resulting diagnostic tool provides three tiers of assessment available to contractors, with the tiers associated with level of effort and budget available for diagnostics. The optimization guide presents ten measures available to contractors to help optimize distribution systems after diagnosing the issues that may be found within a distribution system. The resulting resources will provide contractors with an additional tool to help optimize distribution systems for both gas-fired water heating systems and in retrofits to central heat pump water heaters.
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2026 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Los Angeles Department of Water and Power.