Project Info

Complete
Project Title 
Commercial Tubular Daylighting System
Project Number 
ET11SCE1050
Investor Owned Utilities 
SCE
End-use 
Lighting
Sector 
Commercial
Project Year(s) 
2011 - 2012

Project Summary

This report evaluates the daylighting design and implementation at the Trane Southern California headquarters located in City of Industry, California. The study is managed by Southern California Edison’s (SCE) Design and Engineering Group.

The primary goals of this project are the following:

1) determine the baseline lighting loads in the selected areas,

2) determine the post retrofit lighting load profiles, and

3) determine how much lighting energy and demand savings can be achieved by the new daylighting and control system.