Project Info

Complete
Project Title 
DR-Ready LED Lighting Systems with Advanced Controls in Fast Food Restaurants
Project Number 
DR12SCE06
Investor Owned Utilities 
SCE
End-use 
Lighting
Sector 
Commercial
Project Year(s) 
2012

This study conducted field measurements to evaluate the Demand Response (DR) capabilities of four different advanced lighting controls systems (ALCS). This evaluation specifically relates to Light Emitting Diode (LED) interior lighting in fast food restaurants. The main objectives of the project were to:

  •  Determine whether the ALCS can be scheduled for reliable control of lighting loads as part of Manual DR test events
  •  Determine whether the ALCS can be scheduled for reliable control of lighting loads as part of an Automated Demand Response   
         (AutoDR) test events

Project Report Document

Download PDF Report

Complete form to download the document. To bypass this step, please create an account or log in.