Skip to main content
Project Info COMPLETE Project Title

Field Demonstration Findings for Minimizing Electric Resistance Use in Multifamily and Nonresidential Heat Pump Water Heater Retrofits

Project Number CR24PGE0302-3 Organization PG&E End-use Water Heating/DHW/HPWH Sector Commercial, Residential Project Year(s) 2024 - 2026
Description

This study was conducted to address 1) data gaps about how large split CHPWH’s installed in existing multifamily buildings operate in an RtP configuration compared to the industry standard configuration of returning recirculation water to the systems swing tank (RtS) and 2) better understand how to optimize integrated 120-gallon HPWH’s recently installed as part of retrofit projects replacing natural gas DHW systems. The research provides primary data based evidence on successful implementation of directing the recirculation water to primary storage tanks at five multifamily sites, and an improved understanding of integrated HPWH operation in retrofit scenarios at existing nonresidential buildings. The results offer actionable insights for energy codes, standards, and programmatic initiatives, and provide a foundation for future research and development in this area.

Project Report Document
Loading PDF Preview...
Industry
I have read and accept the Privacy Policy and Terms of Use
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2026 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Los Angeles Department of Water and Power.