Skip to main content
Project Info COMPLETE Project Title

Gas-Fired Heat Pump Water Heating & Combination System Pilot - Phase 1

Project Number ET22SWG0008 Organization SWG (Statewide Gas ETP) End-use Water Heating/DHW/HPWH Sector Commercial Project Year(s) 2022 - N/A
Description
This project is phase 1 of a multi-phase pilot project for gas-fired heat pump water heaters & combination systems. This phase 1 project will do all the groundwork for the future phase 2 and 3 projects to install gas-fired water heating/combination equipment at various sites around California. The future planned phases that are not part of this scope are: Phase 2F: Field testing work Phase 2L: Lab testing work Phase 3F: Additional field testing and/or field-testing hand-off Phase 3L: Additional lab testing and/or modeling work This phase 1 project includes a visit to a site where one of these technologies has been installed, create a project screening tool, create an installation & design checklist, create a generic M&V plan for energy consumption/savings and performance curves, and create a generic hourly CO2 analysis approach.
Project Report Document
Loading PDF Preview...
Industry
I have read and accept the Privacy Policy and Terms of Use
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2000-2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California Statewide Emerging Technologies Program under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.