Project Info COMPLETE Project Title

Low Voltage Technology Scoping Study: Impact of Small AC Units on Electrical System Voltage Recover

Project Number DR 05.05 Organization SCE End-use HVAC Sector Other Project Year(s) 2005 - 2006
Description

Project Summary

Occasionally, the utility electric grid systems undergo voltage fluctuations caused by faults. These faults are caused by storms, accidents, debris on lines, and equipment failures. Normally, protective relaying is used to disconnect the problem lines and then voltage automatically returns to normal. There have been a few occurrences over the last several years where this voltage restoration has been delayed for up to 30 seconds. It is thought that air conditioning units are contributing to this delayed voltage restoration due to stalling compressors. When an air conditioning compressor stalls, its real and reactive power tends to increase which drags down system voltage. These stalled compressors do not disconnect from the electrical system until their internal thermal protection device is activated. Most large air conditioning systems have low-voltage protection; however, smaller units used in residential and light commercial buildings do not typically have this protection. In this project, laboratory testing was performed on residential and small commercial air conditioning units common in Southern California Edison (SCE) service territory to provide insights on their electrical behavior under low-voltage conditions. This project is a component of a larger, multi-year research project (Evaluation of the Effects of Stalling Residential and Small Commercial Air Conditioning Units on Electrical System Voltage Recovery), which seeks to evaluate the impact of stalling air conditioning unit compressors on delayed electrical grid system voltage recovery after a system fault and to investigate practical solutions to reduce/eliminate the stalling problem.

Project Report Document
Loading PDF Preview...
Industry
I have read and accept the Privacy Policy and Terms of Use
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2000-2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California Statewide Emerging Technologies Program under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.