Project Info

Complete
Project Title 
Office of the Future - Landmark Square Building
Project Number 
ET 09.22
Investor Owned Utilities 
SCE
End-use 
Lighting
Sector 
Commercial
Project Year(s) 
2009 - 2011

Project Summary

This Office of the Future pilot project collects measured energy use from on-the-ground installations. A stepped baseline, starting with existing conditions, allows Measurement and Verification (M&V) investigations into the contribution of savings from lighting and lighting controls, and plug load control measures, respectively. Measured outcomes can be compared to the existing baseline and the various code baselines, as defined in California by 2008 Title 24.
 

Project Report Document

Download PDF Report

Complete form to download the document. To bypass this step, please create an account or log in.