Skip to main content
Sector Commercial
End-use HVAC
Project Number ET18PGE1902-2
2018 - 2022
PG&E
PDF Available
COMPLETE
The Sacramento Case Study is one of eight buildings evaluated under a Code Readiness field monitoring research effort to better understand real-world performance of dedicated outdoor air systems (DOAS) in California. The Sacramento site was renovated in 2019 with a partially decoupled HVAC system...
Sector Commercial
End-use HVAC
Project Number ET18PGE1902-1
2018 - 2022
PG&E
PDF Available
COMPLETE
The Martinez Case Study is one of eight buildings evaluated under a Code Readiness field monitoring research effort to better understand real-world performance of dedicated outdoor air systems (DOAS) in California. The Martinez site was renovated in 2019 with a fully decoupled HVAC system using a...
Sector Commercial
End-use Process Loads
Project Number ET22SCE0008
2021 - 2024
SCE
ACTIVE
Convenience store field evaluation of AI-based technology to evaluate its efficacy for broader customer segment in SCE’s service territory. Specifically, EPRI proposes to lead the field evaluation for Measurement and Verification of technology for power reduction (demand savings) and GHG...
Sector Residential
End-use HVAC
Project Number DR21SDG0001
2021 - 2022
SDG&E
PDF Available
COMPLETE
This report documents the evaluation of the energy and on-peak demand savings attributable to the eco+ software feature that was rolled out to ecobee thermostats in the San Diego Gas & Electric Co. (SDG&E) service territory. The implementation of the feature was conducted on a randomized...
Sector Residential
End-use Plug Loads and Appliances
Project Number DR19.03
2019 - 2022
SCE
COMPLETE
This project’s goals are to test optimization of connected thermostats and other loads via voice commands based on TOU rate peak times and customer preferences. Voice interactions related to energy (usage, estimated bills, best times to use appliances, etc.) will undergo evaluation to determine...
Sector Residential
End-use HVAC
Project Number ET14PGE8761_3
2019 - 2020
PG&E
PDF Available
COMPLETE
The purpose of this project was to evaluate the impact of low refrigerant levels on the cooling and heating seasonal energy performance of variable capacity heat pump (VCHP) systems operating in California homes.Prior studies have found that incorrect refrigerant levels are common in field...
Sector Residential
End-use Cooking Equipment, Plug Loads and Appliances
Project Number ET20PGE8201
2021 - 2022
PG&E
PDF Available
COMPLETE
This study investigated the technical and market feasibility and consumer acceptance of residential sensor-based range hoods to automate range hood operation to improve indoor air quality (IAQ) and occupant health. Goals of the study included:Identifying existing and emerging products that use...
Sector Commercial
End-use Whole Building
Project Number DR20.03
2020 - 2025
SCE
ACTIVE
The objective of the study is to assess the costs and benefits of real-time rates, including required infrastructure, manufacturer interest, and customer impacts. The research approach will evaluate tariffs and their characteristics, demonstrate how these tariffs can be communicated to different...
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2026 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California IOU Emerging Technologies Program, the IOU Codes & Standards Planning & Coordination Subprograms, and the Demand Response Emerging Technologies (DRET) Collaborative programs under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Los Angeles Department of Water and Power.