Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR10.61
This project will lab test the DR functionality of the DR capable refrigerator to be installed as part of the ISGD...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR13.56
This project covers SCE involvement in the EPA’s specification development for “Connected” ENERGY STAR products, initiated by EPA to respond to the emerging Smart Grid and the need for compatible end-use products. By participating , SCE seeks to inform EPA on the technical abilities of smart meters...
Sector
Commercial, Public, Industrial
End-use
Whole Building, Lighting, Other, Plug Load, Process
Project Number
ET13PGE8121
This project evaluates the lighting performance and energy savings potential of a Lamp-style Retrofit Kit, External Driver (a solution with separate lamp and driver), combined with a Wireless Advanced Lighting Control System (ALCS) to achieve additional energy savings and DR...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR12.10
This project will evaluate Energy Star Residential Clothes Washers for DR...
Sector
Commercial, Residential, Public, Other
End-use
Plug Load
Project Number
ET12PGE7251
Computers consume nearly 10 terawatt-hours of electricity in California each year. These and other plug-loads will become an ever larger portion of electricity consumption in the state as California aggressively pursues lighting, heating, ventilation and air conditioning, and building envelope...
Sector
Commercial, Public, Other
End-use
Whole Building, Lighting, Plug Load, Process
Project Number
ET12PGE3321
Scaled placement of Advanced Lighting Controls platform and 2x4 LED panels. PG&E had a unique opportunity to verify the energy efficiency potential for two similar floors of a large office building where one floor kept the T-8 3-lamp fluorescent fixtures and the second floor replaced them with 2x4...
Sector
Residential
End-use
Whole Building, Lighting, Other, Process, Water Heating/DHW/HPWH, HVAC, Plug Load
Project Number
ET12PGE1472
Project SummaryThe main objective of this project is to evaluate how well the Honda Smart Home achieves the design goals of reaching zero net energy (ZNE) performance while providing a high level of service to occupants. The project compares modeled energy use estimates to actual energy...
Sector
Residential
End-use
Plug Loads and Appliances
Project Number
DR12.14
This project will evaluate Energy Star Residential Refrigerators and Freezers DR...
Sector
Public
End-use
Whole Building, Lighting, Other, Plug Load, HVAC, Process
Project Number
ET12PGE2211
The Pacific Gas & Electric company (PG&E) installed a zero net energy (ZNE) classroom demonstration at its Stockton Energy Training Center (ETC), which opened to the public on December 13, 2012. The ZNE classroom demonstration is a fully functioning classroom, that is designed as a ZNE...
Sector
Commercial, Other
End-use
Plug Load
Project Number
ET11PGE1051
While there has long been building management systems software to aid management with decisions about energy efficiency, the software to measure the energy efficiency of IT systems in data centers has only recently been developed. This new type of software is the focus of this emerging technology...