Sector
Commercial
End-use
Other
Project Number
DR 08.02
Project SummaryThis project optimizes the Demand Response Quick Assessment Tool (DRQAT), a building energy simulation software tool used to model demand response (DR) events within large commercial buildings. The accuracy of the models, within the software tool, was improved by comparing simulation...
Sector
Industrial
End-use
Other
Project Number
DR 08.03
Project SummaryThis project evaluates the feasibility of sewage treatment plants (STPs) with flows greater than 1 million gallons per day to participate in demand response (DR) programs. DR strategies applicable to the municipal wastewater treatment industry were identified and 10 STP site audits...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0820
Project SummeryThis report summarizes the installation and assessment of an integrated lighting control system consisting of occupancy sensors, photo sensors, dimming ballast, reduction of ambient overhead lighting and the installation of LED task lighting at a stand alone two story office building...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0819
Project SummaryThis report summarizes the installation and assessment of an integrated "task ambient" lighting system combined with a reduction of ambient overhead lighting and increase in task lighting, at a multi-story commercial office building in Northern California. Relying primarily on field...
Sector
Commercial
End-use
Lighting
Project Number
PGE 0817
This report summarizes the installation and assessment of advanced skylight systems at a retail hardware store in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as well as customer satisfaction surveys and economic payback...
Sector
Commercial, Industrial
End-use
Lighting
Project Number
PGE 0814
Project SummaryThis report summarizes the installation and assessment of advanced lighting control systems at the administrative offices of an engineering consulting firm in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements,...
Sector
Commercial, Industrial
End-use
Lighting
Project Number
PGE 0813
Project Summary This report summarizes the installation and assessment of advanced lighting control systems at the administrative offices of a large beverage processing plant in Northern California. Relying primarily on field testing, the project team conducted photometric and power...
Sector
Commercial, Public
End-use
Lighting
Project Number
PGE 0806
Project SummaryThis report summarizes the installation and assessment of advanced lighting control systems at the administrative offices of a water district location in Northern California. Relying primarily on field testing, the project team conducted photometric and power measurements, as...
Sector
Commercial, Public, Industrial
End-use
Other
Project Number
PGE 0826
Project Summary This report summarizes the functional performance and demand response (DR) potential of three advanced lighting control technologies that were assessed in office environments in Northern California. The technologies assessed included the Adura LightPoint System,...
Sector
Other
End-use
HVAC
Project Number
PGE 0812
Project SummaryA significant portion of the energy in data centers is currently dedicated to provide cooling for the server equipment. Data centers must provide continuous air conditioning to address high internal heat loads (heat release from computer servers) and maintain indoor temperatures...