Skip to main content
Project Info COMPLETE Project Title

ThermoSorber for Food Processing

Project Number PGE 0708 Organization PG&E End-use Plug Load Sector Commercial, Public, Other, Industrial, Residential Project Year(s) 2007 - 2008
Description

Project Summary

Food processing facilities often have concurrent needs for chilling and heating water, operations that are generally provided by natural gas fired boilers and electric driven chillers. This study examines ThermoSorbersTM, combined chiller-heat pumps that provide simultaneous chilled and hot water and that can generate significant savings: up to 40% of the gas and 90% of the electricity of conventional systems. This test involves a 100-ton system at a food processing facility in California\'s central valley. For more information, please contact the sponsoring organization.

Project Report Document
Loading PDF Preview...
Industry
I have read and accept the Privacy Policy and Terms of Use
  • Pacific Gas & Electric Company logo
  • Southern California Edison Company logo
  • Southern California Gas Company logo
  • San Diego Gas & Electric Company logo
  • Sacramento Municipal Utility District logo
  • Los Angeles Department of Water and Power logo
  • CEC logo

Copyright © 2000-2024 Energy Transition Coordinating Council. Trademarks are the property of their respective owners. All rights reserved.

The ETCC is funded in part by ratepayer dollars and the California Statewide Emerging Technologies Program under the auspices of the California Public Utilities Commission. The municipal portion of this program is funded and administered by Sacramento Municipal Utility District and Los Angeles Department of Water and Power.