Project Info

Complete
Project Title 
Wine Stabilization through Electrodialysis
Project Number 
PGE 0612
Organization 
PG&E
End-use 
Process
Sector 
Commercial, Agricultural
Project Year(s) 
2006 - 2007

Project Summary

Implementing electrodialysis wine stabilization instead of traditional cold stabilization is demonstrated to show electrical energy and demand savings. This Project was done on 18,500 gallon of Pinot Grigio in two uninsulated tanks. Results indicated 99% (26,700 kWh) electrcity savings and 80% (19kW) demand savings. Also, approximately 3,000 gallons of water was consumed using electrodialysis. For more information, please contact the sponsoring organization.

Project Report Document

Download PDF Report

Complete form to download the document. To bypass this step, please create an account or log in.