Project Info
          COMPLETE
                                  Project Title
          
              Wine Stabilization through Electrodialysis
Project Number PGE 0612 Organization PG&E End-use Process Sector Commercial, Agricultural Project Year(s) 2006 - 2007Description
                Project Summary
Implementing electrodialysis wine stabilization instead of traditional cold stabilization is demonstrated to show electrical energy and demand savings. This Project was done on 18,500 gallon of Pinot Grigio in two uninsulated tanks. Results indicated 99% (26,700 kWh) electrcity savings and 80% (19kW) demand savings. Also, approximately 3,000 gallons of water was consumed using electrodialysis. For more information, please contact the sponsoring organization.
                  Project Report Document
          
            
                                    
                                  
                  
                    
                  
                              
                                            
      
              
              Loading PDF Preview...