Sector
          
            Commercial, Agricultural
          
        
                    
          End-use
          
            Whole Building, Process
          
        
                    
          Project Number
          
            ET12PGE1401
          
        
           
    
    
      The project was initiated to test emerging evaluation approaches to identify operational and technical opportunities to optimize energy and water usage of pressurized irrigation systems. The combined evaluation incorporates information derived from a "standard" pump efficiency test and a "standard"...    
   
  
  
  
  
    
              
          Sector
          
            Commercial, Agricultural
          
        
                    
          End-use
          
            Process
          
        
                    
          Project Number
          
            ET12PGE1431
          
        
           
    
    
      This project tested performance characteristics of pressure regulating valves and pressure compensating emitters from a variety of manufacturers.  In addition to the research, the Consultant coordinated the implementation of these low-pressure components on a commercial agriculture operation and...    
   
  
  
  
  
    
              
          Sector
          
            Commercial, Public, Other
          
        
                    
          End-use
          
            Whole Building, Process
          
        
                    
          Project Number
          
            ET11SDGE0014
          
        
           
    
    
      This study investigates the energy savings capability and potential of ultra-low temperature freezer monitoring systems when used as an energy consumption diagnostic tool. Ultra-low temperature (ULT) freezers are common in university labs and facilities involved in research and development...    
   
  
  
  
  
    
              
          Sector
          
            Commercial, Public
          
        
                    
          End-use
          
            HVAC
          
        
                    
          Project Number
          
            ET12SDGE0003
          
        
           
    
    
      Four different retrofit RTU controllers were tested on four 7.5 ton heat pumps serving office space at one building in San Diego. The operation of those units was alternated on a weekly basis from baseline to retrofit mode. Proper operation of the each controller was verified and the features of...    
   
  
  
  
  
    
              
          Sector
          
            Commercial, Public, Other
          
        
                    
          End-use
          
            Whole Building, HVAC
          
        
                    
          Project Number
          
            ET11SDGE0016
          
        
           
    
    
      In many cases, buildings lack automatic ventilation feedback and are consequently over-ventilated. This report investigates the potential energy savings for a demand control ventilation (DCV) system with centralized air quality sensors. This technology aims to maintain or improve building comfort,...    
   
  
  
  
  
    
              
          Sector
          
            Residential
          
        
                    
          End-use
          
            Other, Whole Building, Water Heating/DHW/HPWH
          
        
                    
          Project Number
          
            DR10SDGE0004
          
        
           
    
    
      This review investigates the demand response (DR) and control capability of a Home Area Network (HAN) technology with Smart Appliances.  Secondly, it discusses energy savings potential, ease of installation, and user feedback on the technology.  This review describes in detail the technology and...    
   
  
  
  
  
    
              
          Sector
          
            Residential
          
        
                    
          End-use
          
            Other, Whole Building, Process
          
        
                    
          Project Number
          
            DR13SDGE0004
          
        
           
    
    
      This study investigates the demand response (DR) capability and potential of a controller which can lower the speed of variable speed pool pumps. The vast majority of incumbent pool pumps are single speed and can only be turned off for DR measures. Variable speed pool pumps have the ability to...    
   
  
  
  
  
    
              
          Sector
          
            Commercial
          
        
                    
          End-use
          
            Lighting
          
        
                    
          Project Number
          
            ET12SDGE0001
          
        
           
    
    
      A side-by-side comparison was done with the conventional technology, MH HID, and the emerging technologies, LED and induction. Based upon pump island occupancy, the bi-level light sources would allow for the under-canopy lights to be further dimmed to a light level acceptable to the station’s...    
   
  
  
  
  
    
              
          Sector
          
            Commercial, Public
          
        
                    
          End-use
          
            Lighting
          
        
                    
          Project Number
          
            ET12PGE3361
          
        
           
    
    
      This project partnered with ACE Hardware’s Distribution Center located in Rocklin, CA and tested the integration of High Bay Light Emitting Diode (LED) lighting fixtures with integrated sensors and an aggressive Advanced Lighting Control System (ALCS) to realize the deepest energy savings possible...    
   
  
  
  
  
    
              
          Sector
          
            Public
          
        
                    
          End-use
          
            
          
        
                    
          Project Number
          
            ET12PGE5421
          
        
           
    
    
      The primary goal of this project was to develop a complete, standardized auditing procedure that PG&E field representatives, consultants, or water agencies themselves could perform on municipal water systems. The procedure was to be a simple audit, requiring limited time, measurements, and...